Operation
- ONLY AFTER PROPER INSTALLATION IS COMPLETED SHOULD YOU PROCEED WITH LEAK TEST OPERATION.
- PROSTRAINER SHOULD BE INSTALL ON THE SUCTION SIDE OF PUMP ONLY.
- ALWAYS CHECK VALVE POSITION (OPEN OR CLOSED) BEFORE STARTING PUMP.
- NEVER START PUMP UNTIL ALL SYSTEM CIRCUIT VALVES ARE IN FULL OPEN POSITION
- NEVER OPEN OR CLOSE VALVES QUICKLY WHILE PUMP IS RUNNING OR SERIOUS DAMAGE MAY OCCUR WHICH WILL VOID WARRANTEE
- Pool, water feature, fountain or other fluid body must be filled to proper operating level.
- Pump must have power and be previously tested for proper rotation.
- Open all valves to operating position
- Turn on pump, resolve any leaking issues.
- Periodically examine the baskets to see how full they are when pump vacuum increases by a predetermined amount (generally 3 inches of Mercury) clean baskets.
- Always clean baskets prior to long periods of anticipated unattended maintenance.
NOTES:
It may be necessary to make adjustment to the lid draw latches after the break in period has occurred or if the gasket is disturbed during cleaning.